Edit NexPhase

NexPhase Demo


Edit NexPhase: Pepperell Park
Must be 1 - 40 characters long
Required, select NexPhase type
Optional, -90.0 - 90.0
Optional, -180.0 - 180.0
Check if NexPhase has a hydrocarbon sensor
Check if NexPhase has a flooding sensor
Check if NexPhase should intermittently check and warn if a charger has not had a transaction recently
Modules
Enable and configure the Relay Controller module
Enable and configure the HMC module
Must be in the format 00-0000-0000-0000-00
Displays and allows MQTT password configuration when enabled
Enable and configure Charger 1
Must be 1 - 40 characters long
Check if charger has a separate 120 V connection
Check if charger has a tilt sensor
Enable and configure Charger 2
Must be 1 - 40 characters long
Check if charger has a separate 120 V connection
Check if charger has a tilt sensor
Enable and configure Charger 3
Must be 1 - 40 characters long
Check if charger has a separate 120 V connection
Check if charger has a tilt sensor
Enable and configure Charger 4
Must be 1 - 40 characters long
Check if charger has a separate 120 V connection
Check if charger has a tilt sensor

Cancel